Changes between Version 18 and Version 19 of docs/CommissioningPlan/P2.2
- Timestamp:
- 04/22/22 19:11:06 (3 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P2.2
v18 v19 5 5 - **Category** : Daytime testing (functionality and operability) (C3) 6 6 - **Recurrence** : once after instrument installation at telescope platform 7 - **Duration** : 2 days7 - **Duration** : 1 day 8 8 9 9 **Description** … … 19 19 - Using the on-axis diffraction-limited light source, check the internal alignment of the SHARK-NIR. 20 20 - Check the relative positions of the coronagraphic masks. 21 - Check ofon-axis optical quality.21 - Check for on-axis optical quality. 22 22 23 23 **Templates**