    55- **Category**  :       Daytime testing (functionality and operability) (C3)                           
    66- **Recurrence**        :       once after instrument installation at telescope platform
    7 - **Duration**  :       2 days
     7- **Duration**  :       1 day
    88
    99**Description**
     
    1919- Using the on-axis diffraction-limited light source, check the internal alignment of the SHARK-NIR.
    2020- Check the relative positions of the coronagraphic masks.
    21 - Check of on-axis optical quality.
     21- Check for on-axis optical quality.