Changes between Version 6 and Version 7 of docs/CommissioningPlan/P2.0
- Timestamp:
- 01/26/21 16:33:42 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P2.0
v6 v7 3 3 • **Status** : Draft 4 4 • **Category** : Unpack, Assemble, Verification, and Installation (C1) 5 • **Recurrence** : once 5 • **Recurrence** : once (unless deemed necessary to remove SHARK-NIR from the telescope platform) 6 6 • **Duration** : 2 days for preparation, 1 day for installation , and 1 day contingency. 7 7 **Description** … … 10 10 • SHARK-NIR is aligned and ready for the lift-off. 11 11 **Procedure** 12 • Look at [https://www.dropbox.com/home/SHARK-NIR/Released%20Docs/After%20FDR_do%20not%20update?preview=SHARK-NIR-INAFP-IP-001_Issue0.2.pdf this]document for the procedure and details.12 • Look at AD4 document for the procedure and details. 13 13 **Success criteria** 14 14 • SHARK-NIR successfully installed at the LBT platform. … … 17 17 • Reassure all the connections, nuts and bolts, etc. 18 18 **Notes** 19 Note that SHARK-NIR is NOT installed as a single piece. The cryostat has to be disassembled from bearing before the installation can start. Please look into the AD4 document for details. 19 20 20 21 **LBTO support** … … 32 33 **Comments** 33 34 34 MB: Please specify that Cryostat has to be di assembled from bearing before the installation can start. Put AD number instead of link.35 MB: Please specify that Cryostat has to be disassembled from bearing before the installation can start. Put AD number instead of link. 35 36 Concerning recurrence, in principle is only one, however optical bench only might have very low chances of being dismounted at some point for refurbishment of components which might be hard to happen in place