Changes between Version 20 and Version 21 of docs/CommissioningPlan/P2.0
- Timestamp:
- 10/28/22 18:22:11 (2 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P2.0
v20 v21 1 == P2.0 SHARK-NIR Open Cart Activities==1 == [[span(style=color: green, **P2.0 SHARK-NIR Open Cart Activities** )]] == 2 2 • **Phase** : 2 3 • **Status** : Draft3 • **Status** : [[span(style=color: green, **COMPLETE** )]] 4 4 • **Category** : Unpack, Assemble, Verification, and Installation (C1) 5 5 • **Recurrence** : once (unless deemed necessary to remove SHARK-NIR from the telescope platform) 6 6 • **Duration** : 1 day 7 7 **Description** 8 • All activities to be done on the SHARK-NIR optical bench with the cart open.8 • All activities are to be done on the SHARK-NIR optical bench with the cart open. 9 9 **Prerequisites** 10 • electronics lab cleaned u up by LBTO10 • electronics lab cleaned up by LBTO 11 11 **Procedure** 12 12 - For each rotatory stage, PI116.DGH: 13 - put 2 drops of Rodorsil 47V500 oil on the shaft of the filter wheels, without dismounting anything. Make the mirror rotate completely a few timesso that the oil distributes on the whole shaft.13 - put two drops of Rodorsil 47V500 oil on the shaft of the filter wheels without dismounting anything. Make the mirror rotate a few times completely so that the oil distributes on the whole shaft. 14 14 - leave the C-RED2 ND filter wheel as last since it requires dismounting the folding mirror and the lens. 15 15 16 - Re-align tilt of both SCI filter wheelsto eliminate ghosts from flat field images.16 - Re-align both SCI filter wheels tilt to eliminate ghosts from flat field images. 17 17 - Install barometric pressure gauge (details to be added) 18 18 - clean the optical bench