Changes between Initial Version and Version 1 of docs/CommissioningPlan/SDC6


Ignore:
Timestamp:
01/15/21 18:54:27 (4 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/SDC6

    v1 v1  
     1== SDC6 Detector persistence ==
     2•       **Phase**               :       Any 
     3•       **Status**              :       Draft   
     4•       **Category**            :       Daytime calibration (C3)
     5•       **Recurrence**  :       once every 1-3 months starting from commissioning.
     6•       **Duration**            :       20 minutes
     7**Description**
     8•       Monitor persistence after saturation.
     9**Prerequisites**
     10•       Instrument and dome closed. No lights inside dome.
     11**Procedure**
     12•       Record a background exposure, then one highly saturated exposure; then a long series of exposures with source off.
     13•       CI B_H, point source.
     14**Success criteria**
     15•       Accuracy of photometry 10% 
     16**Notes**
     17•       Same as activity 9.3 in AD4
     18**LBTO support**
     19
     20**Associated SHARK-NIR personnel**
     21
     22**Date performed and by whom**