SDC6 Detector persistence

  • Phase : 1
  • Status : COMPLETE
  • Category : Daytime calibration (C3)
  • Recurrence : once every 1-3 months starting from commissioning.
  • Duration : 20 minutes (this duration is valid only during regular operations, i.e., after commissioning)

Description

  • Monitor persistence after saturation.

Prerequisites

  • Instrument and dome closed. No lights inside the dome.

Procedure

  • Record a background exposure, then one highly saturated exposure; then a long series of exposures with source off.
  • CI B_H point source.

Templates

  • SHARKNIR_ci_mon_DetectorPersistence

Success criteria

  • Accuracy of photometry 10%.

Notes

  • Same as activity 9.3 in AD4

LBTO support

Date performed and by whom