Changes between Version 1 and Version 2 of docs/CommissioningPlan/SDC5
- Timestamp:
- 01/14/22 13:04:30 (3 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/SDC5
v1 v2 1 1 == SDC5 Detector gain == 2 • **Phase** : Any 3 • **Status** : Draft 4 • **Category** : Daytime calibration (C3) 5 • **Recurrence** : once every month starting from commissioning. 6 • **Duration** : 20 minutes 2 3 - **Phase** : Any 4 - **Status** : Draft 5 - **Category** : Daytime calibration (C3) 6 - **Recurrence** : once every month starting from commissioning. 7 - **Duration** : 20 minutes 8 7 9 **Description** 8 • Monitor detector gain factor, RON, and non-linearity over time. 10 - Monitor detector gain factor, RON, and non-linearity over time. 11 9 12 **Prerequisites** 10 • Instrument and dome closed 13 - Instrument and dome closed 14 11 15 **Procedure** 12 • This calibration is performed by reading the detector without any light illumination i.e. using an opaque position during 600s. 13 • Continuous extended source in the calibration; various ND; various integration times. CI in B_H. 16 - This calibration is performed by reading the detector without any light illumination i.e. using an opaque position during 600s. 17 - Continuous extended source in the calibration; various ND; various integration times. CI in B_H. 18 14 19 **Success criteria** 15 • 5% expected accuracy. 20 - 5% expected accuracy. 21 22 **Templates** 23 16 24 **Notes** 17 • Same as activity 9.2 in AD4 25 - Same as activity 9.2 in AD4 26 18 27 **LBTO support** 19 28 20 **Associated SHARK-NIR personnel**21 22 29 **Date performed and by whom**