wiki:docs/CommissioningPlan/SDC5

SDC5 Detector gain

  • Phase : 1
  • Status : COMPLETE
  • Category : Daytime calibration (C3)
  • Recurrence : once every month starting from commissioning.
  • Duration : 20 minutes (this duration is valid only during regular operations, i.e., after commissioning)

Description

  • Monitor detector gain factor, RON, and non-linearity over time.

Prerequisites

  • Instrument and dome closed

Procedure

  • This calibration is performed by reading the detector without any light illumination i.e. using an opaque position during 600s.
  • Continuous extended source in the calibration; various ND; various integration times. CI in B_H.

Templates

  • SHARKNIR_di_mon_DetectorGain

Success criteria

  • 5% expected accuracy.

Notes

  • Same as activity 9.2 in AD4

LBTO support

Date performed and by whom

Last modified 15 months ago Last modified on 10/12/23 11:14:00