SDC5 Detector gain
- Phase : 1
- Status : COMPLETE
- Category : Daytime calibration (C3)
- Recurrence : once every month starting from commissioning.
- Duration : 20 minutes (this duration is valid only during regular operations, i.e., after commissioning)
Description
- Monitor detector gain factor, RON, and non-linearity over time.
Prerequisites
- Instrument and dome closed
Procedure
- This calibration is performed by reading the detector without any light illumination i.e. using an opaque position during 600s.
- Continuous extended source in the calibration; various ND; various integration times. CI in B_H.
Templates
- SHARKNIR_di_mon_DetectorGain
Success criteria
- 5% expected accuracy.
Notes
- Same as activity 9.2 in AD4
LBTO support
Date performed and by whom
Last modified 15 months ago