wiki:docs/CommissioningPlan/SDC5

Version 1 (modified by kradhakrishnan, 4 years ago) (diff)

--

SDC5 Detector gain

  • Phase : Any
  • Status : Draft
  • Category : Daytime calibration (C3)
  • Recurrence : once every month starting from commissioning.
  • Duration : 20 minutes

Description

  • Monitor detector gain factor, RON, and non-linearity over time.

Prerequisites

  • Instrument and dome closed

Procedure

  • This calibration is performed by reading the detector without any light illumination i.e. using an opaque position during 600s.
  • Continuous extended source in the calibration; various ND; various integration times. CI in B_H.

Success criteria

  • 5% expected accuracy.

Notes

  • Same as activity 9.2 in AD4

LBTO support

Associated SHARK-NIR personnel

Date performed and by whom