Changes between Version 3 and Version 4 of docs/CommissioningPlan/P3.9
- Timestamp:
- 02/04/21 22:47:14 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P3.9
v3 v4 2 2 • **Phase** : 3 3 3 • **Status** : Draft 4 • **Category** : Nighttime testing (functionality and operability) (C 4)4 • **Category** : Nighttime testing (functionality and operability) (C5) + Nighttime testing for performance (C7) 5 5 • **Recurrence** : once at commissioning 6 • **Duration** : 2 hours6 • **Duration** : 2 nights 7 7 **Description** 8 8 • Evaluate the performance of the internal tip-tilt (TT) loop of SHARK-NIR for stars of varying brightness. 9 9 **Prerequisites** 10 • Atmospheric conditions: ?10 • Atmospheric conditions: TBD 11 11 • Authorize SHARK-NIR on the SX side. 12 12 • Stars (of known brightness from 8mag-13mag in R band) as targets. … … 18 18 * Use data to estimate the improvement of the residual jitter after the TT loop is closed. 19 19 * Repeat for different star magnitudes. 20 * should we perform as a function of elevation as well? we can cho se stars accordingly then?20 * should we perform as a function of elevation as well? we can choose stars accordingly then? 21 21 22 22 **Success criteria**