Changes between Version 3 and Version 4 of docs/CommissioningPlan/P3.5
- Timestamp:
- 01/26/21 12:15:15 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P3.5
v3 v4 4 4 • **Category** : Nighttime testing (functionality and operability) (C4) 5 5 • **Recurrence** : once at commissioning 6 • **Duration** : 1 hour6 • **Duration** : 1.5 hour 7 7 **Description** 8 • Adjust the orientation of the coronagraphic masks with respect to the true orientation of M2 spider.8 • Adjust the orientation of the coronagraphic masks with respect to the true orientation of the M2 spider by rotating the SHARK-NIR derotator. 9 9 **Prerequisites** 10 • Atmospheric conditions: should be able to see b ight stars on the sky (preferably close to zenith?).10 • Atmospheric conditions: should be able to see bright stars in the sky (preferably close to zenith?). 11 11 • Authorize SHARK-NIR on the SX side. 12 12 • Suitable bright enough star close to zenith to have negligible effects from flexures (including the possibility of performing AO). … … 15 15 • This operation is repeated for all the coronagraphs. 16 16 **Success criteria** 17 • All the coron ograph are aligned to the true orientation of the M2 spider by maximizing the contrast at SCICAM.18 • Note down the contrast achieved for all the coron ographincluding the atmospheric conditions and the brightness of the on-axis star.17 • All the coronagraph are aligned to the true orientation of the M2 spider by maximizing the contrast at SCICAM. 18 • Note down the contrast achieved for all the coronagraphs including the atmospheric conditions and the brightness of the on-axis star. 19 19 **Notes** 20 20 **LBTO support** … … 25 25 **Comments** 26 26 27 MB: when saying orientation better to specify through wheel rotation 27 MB: when saying orientation better to specify through wheel rotation DONE.