wiki:docs/CommissioningPlan/P3.5

P3.5 Verify the ADC rotation on sky

  • Phase : 3
  • Status : COMPLETE
  • Category : Nighttime testing (functionality and operability) (C5)
  • Recurrence : once at commissioning
  • Duration : 4 hours

Description

  • Evaluate the performance of the SHARK-NIR ADC.

Prerequisites

  • Atmospheric conditions: photometric.
  • Authorize SHARK-NIR on the SX side.
  • Photometric stars as targets for every filter.
  • AO is working.
  • Target(s) at different Zenith distances?

Procedure

  • Check the working of the ADC using different targets in varying zenith distances and observing using different science filters?
  • More details in this link.

Templates

Success criteria

  • xxx

Notes

LBTO support

  • AO support

Date performed and by whom

Last modified 7 months ago Last modified on 10/12/23 09:51:34