P3.3 SOUL-AO verification
- Phase : 3
- Status : Draft
- Category : Nighttime testing (functionality and operability) (C5) + Nighttime testing for performance (C7)
- Recurrence : after instrument installation at telescope platform
- Duration : 1 night
Description
- Proper working and tuning of the SOUL-AO parameters are verified. If any minor adjustments are required, they are either implemented immediately or marked for later daytime work. Also for various stars of different magnitudes, the SOUL AO performance is verified.
Prerequisites
Procedure
- AO verification procedure TBD
- AO performance procedure TBS
Success criteria
- SOUL AO system working in tandem with the SHARK-NIR system.
- Acceptable improvement of the on-axis PSF for a given seeing and brightness of the star.
Notes
LBTO support
- AO Support
Associated SHARK-NIR personnel
Date performed and by whom