Changes between Version 2 and Version 3 of docs/CommissioningPlan/P3.10
- Timestamp:
- 01/19/21 17:27:17 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P3.10
v2 v3 1 == P3. 7 Verify the ADC rotation on sky==1 == P3.10 NCPA working and performance == 2 2 • **Phase** : 3 3 3 • **Status** : Draft 4 4 • **Category** : Nighttime testing (functionality and operability) (C4) 5 5 • **Recurrence** : once at commissioning 6 • **Duration** : 4hours6 • **Duration** : 12 hours 7 7 **Description** 8 • Evaluate 8 • Evaluate the NCPA working and performance using the baseline approach, phase-diversity approach, combination of both, and measurement of NCPA using the Wollaston prison & dual-band imaging. 9 9 10 **Prerequisites** 10 • Atmospheric conditions: photometric.11 • Atmospheric conditions: ? 11 12 • Authorize SHARK-NIR on the SX side. 12 • Photometric stars as targets for every filter.13 13 • AO working. 14 • Target(s) at different Zenith distances? 14 • Target(s) at different Zenith distances with different magnitudes? 15 15 16 **Procedure** 16 • Check the working of the ADC using different targets in varying zenith distances and observing using different science filters? 17 • Acquire star of given magnitude. Start SOUL-AO. 18 * Check the working and performance of the NCPA baseline approach. Take images at SCICAM. 19 * Check the phase diversity approach (using the internal calibration source). Take images at SCICAM. 20 * Check the phase diversity approach using Wollaston prism + DI-DBI. Take images at SCICAM. 21 * Repeat for a different star (of different magnitudes and for different elevation of the telescope) 22 17 23 **Success criteria** 18 • xxx24 • ??? 19 25 **Notes** 20 26 21 27 **LBTO support** 22 28 • SOUL-AO support 29 23 30 **Associated SHARK-NIR personnel** 24 31