Version 2 (modified by kradhakrishnan, 4 years ago) (diff) |
---|
P3.7 Verify the ADC rotation on sky
- Phase : 3
- Status : Draft
- Category : Nighttime testing (functionality and operability) (C4)
- Recurrence : once at commissioning
- Duration : 4 hours
Description
- Evaluate
Prerequisites
- Atmospheric conditions: photometric.
- Authorize SHARK-NIR on the SX side.
- Photometric stars as targets for every filter.
- AO working.
- Target(s) at different Zenith distances?
Procedure
- Check the working of the ADC using different targets in varying zenith distances and observing using different science filters?
Success criteria
- xxx
Notes
LBTO support
- SOUL-AO support
Associated SHARK-NIR personnel
Date performed and by whom