wiki:docs/CommissioningPlan/P2.8

Version 7 (modified by kradhakrishnan, 4 years ago) (diff)

--

P2.8 Looking for filter defects/artifacts + Science detector calibrations repeat

  • Phase : 2
  • Status : Draft
  • Category : Daytime testing (functionality and operability) (C2)
  • Recurrence : once at commissioning
  • Duration : 2 days

Description

  • Finding the filter defects/artifacts using an internal calibration source (flat /on-axis PSF?) within the instrument.

Prerequisites

  • NCPA measurement (within SHARK-NIR bench using internal sources) available.

Procedure

  • Take the images of all the filters using internal calibration source lamps within the instrument to locate/find out the filter effects/artifacts.
  • You may take short- and long-exposures to get better contrast of the features if required.
  • Repeat the science calibrations as done in P1.9.
  • Perform the working of this monitoring activity Filter wheels reproducibility monitoring.

Success criteria

  • All the filter images saved.

Notes

  • The time dedicated to this activity has to be considered in combination with the next activity if needed. Parallelism is possible.

LBTO support

Associated SHARK-NIR personnel

Date performed and by whom

Comments

MB: I wonder why this needs to happen in this phase. I would say it could be done at any moment with internal sources, except of course for the dichroic / LBT mirrors