wiki:docs/CommissioningPlan/P1.9

P1.9 Testing of SCICAM image grabbing by SOUL-AO

  • Phase : 1
  • Status : COMPLETE
  • Category : Daytime testing (functionality and operability) (C3)
  • Recurrence : once
  • Duration : 0.5 days

Description

  • Testing the SCICAM imaging grabbing (from a repository/folder) by SOUL-AO, which is a pre-requisite for the SOUL-AO optimization for SHARK-NIR.

Prerequisites

  • ICE compatibility between SHARK-NIR and SOUL-AO system.
  • SCICAM image should have a header following FITS standard.

Procedure

  • Save a SCICAM image (with a PSF image) on the agreed folder or repository.
  • Check if SOUL-AO can grab the image and analyze the PSF.

Templates

Success criteria

  • SOUL-AO SW can grab the SCICAM image.

Notes

  • The time dedicated to this activity has to be considered in combination with the other activities if needed. Parallelism is possible.
  • Points of contact: Alfio and Fabio from Arcetri.

LBTO support

  • Liquid Nitrogen refill is required in the cleanroom.
  • Support of an IT personnel (for help related to network configuration) and an SW personnel (for help related to the TCS interface).

Date performed and by whom

  • Alfio, Davide, Fulvio.

Result

  • The result and log can be found in this link.
Last modified 18 months ago Last modified on 12/02/22 09:28:52