Changes between Version 6 and Version 7 of docs/CommissioningPlan/P2.8


Ignore:
Timestamp:
01/26/21 11:40:18 (4 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P2.8

    v6 v7  
    1  == P2.8        Looking for filter defects/effects/features + Science detector calibrations repeat ==
     1 == P2.8        Looking for filter defects/artifacts + Science detector calibrations repeat ==
    22•       **Phase**               :       2 
    33•       **Status**              :       Draft   
     
    66•       **Duration**            :       2 days
    77**Description**
    8 •       Finding the filter defects/effects/features using different lamps within the instrument.
    9 •       If required, this may be repeated for on-axis source from RR for selected or all filters while the AO loop is running (daytime)
     8•       Finding the filter defects/artifacts using an internal calibration source (flat /on-axis PSF?) within the instrument.
     9
    1010**Prerequisites**
    11 •       If relevant, estimate and remove the NCPA using the phase-diversity method.
    12 •       RR mounted on SX side.
     11•       NCPA measurement (within SHARK-NIR bench using internal sources) available.
     12
    1313**Procedure**
    14 •       Take the images of all the filters using different lamps within the instrument to locate/find out the filter effects/defects/features.
     14•       Take the images of all the filters using internal calibration source lamps within the instrument to locate/find out the filter effects/artifacts.
    1515•       You may take short- and long-exposures to get better contrast of the features if required.
    16 •       This may be repeated with the on-axis source from the RR with AO running to check for any extra features arriving from outside SHARK-NIR but from LBT mirrors or the deployable arm.
    1716•       Repeat the science calibrations as done in [wiki:/docs/CommissioningPlan/P1.9 P1.9].
    1817* Perform the working of this monitoring activity [wiki:/docs/Commissioning/SNM1 Filter wheels reproducibility monitoring.]
     
    2322•       The time dedicated to this activity has to be considered in combination with the next activity if needed. Parallelism is possible.
    2423**LBTO support**
    25 * Authorize SHARK-NIR on the SX side.
    26 * RR mounted on the SX side.
    27 * Support from LBT SW Team, LBTI/Arcetri team to run SOUL AO
    2824
    2925**Associated SHARK-NIR personnel**