Changes between Version 6 and Version 7 of docs/CommissioningPlan/P2.8
- Timestamp:
- 01/26/21 11:40:18 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P2.8
v6 v7 1 == P2.8 Looking for filter defects/ effects/features + Science detector calibrations repeat ==1 == P2.8 Looking for filter defects/artifacts + Science detector calibrations repeat == 2 2 • **Phase** : 2 3 3 • **Status** : Draft … … 6 6 • **Duration** : 2 days 7 7 **Description** 8 • Finding the filter defects/ effects/features using different lampswithin the instrument.9 • If required, this may be repeated for on-axis source from RR for selected or all filters while the AO loop is running (daytime) 8 • Finding the filter defects/artifacts using an internal calibration source (flat /on-axis PSF?) within the instrument. 9 10 10 **Prerequisites** 11 • If relevant, estimate and remove the NCPA using the phase-diversity method.12 • RR mounted on SX side. 11 • NCPA measurement (within SHARK-NIR bench using internal sources) available. 12 13 13 **Procedure** 14 • Take the images of all the filters using different lamps within the instrument to locate/find out the filter effects/defects/features.14 • Take the images of all the filters using internal calibration source lamps within the instrument to locate/find out the filter effects/artifacts. 15 15 • You may take short- and long-exposures to get better contrast of the features if required. 16 • This may be repeated with the on-axis source from the RR with AO running to check for any extra features arriving from outside SHARK-NIR but from LBT mirrors or the deployable arm.17 16 • Repeat the science calibrations as done in [wiki:/docs/CommissioningPlan/P1.9 P1.9]. 18 17 * Perform the working of this monitoring activity [wiki:/docs/Commissioning/SNM1 Filter wheels reproducibility monitoring.] … … 23 22 • The time dedicated to this activity has to be considered in combination with the next activity if needed. Parallelism is possible. 24 23 **LBTO support** 25 * Authorize SHARK-NIR on the SX side.26 * RR mounted on the SX side.27 * Support from LBT SW Team, LBTI/Arcetri team to run SOUL AO28 24 29 25 **Associated SHARK-NIR personnel**