Changes between Version 19 and Version 20 of docs/CommissioningPlan/P2.8
- Timestamp:
- 04/22/22 19:34:18 (3 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P2.8
v19 v20 1 == P2.8 Checking pointing offset between SHARK-NIR and SOUL-AO==1 == P2.8 Verification of the mask centering algorithm and final contrast with SOUL-AO and turbulence at ASM== 2 2 3 3 - **Phase** : 2 … … 5 5 - **Category** : Daytime testing (functionality and operability) (C3) + Daytime calibration (C4) 6 6 - **Recurrence** : once at commissioning 7 - **Duration** : 1 day7 - **Duration** : 3 days 8 8 9 9 **Description** 10 - Test to check if there is a considerable pointing offset between the SHARK-NIR (SCICAM/TECCAM) and SOUL-AO as a function of the elevation of the telescope10 - Verify the efficiency of the mask-centering algorithm and the final contrast with SOUL-AO and artificial turbulence intruded at the ASM. 11 11 12 12 **Prerequisites** … … 14 14 15 15 **Procedure** 16 - TB D16 - TBW 17 17 18 18 **Templates** 19 19 20 20 **Success criteria** 21 - Estimate the pointing offset and conclude if it is acceptable or not. If not acceptable, take proper actions to overcome this issue.21 - Final contrast produced for various seeing conditions matches the simulations. 22 22 23 23 **Notes**