wiki:docs/CommissioningPlan/P2.8

Version 19 (modified by kradhakrishnan, 3 years ago) (diff)

--

P2.8 Checking pointing offset between SHARK-NIR and SOUL-AO

  • Phase : 2
  • Status : Draft
  • Category : Daytime testing (functionality and operability) (C3) + Daytime calibration (C4)
  • Recurrence : once at commissioning
  • Duration : 1 day

Description

  • Test to check if there is a considerable pointing offset between the SHARK-NIR (SCICAM/TECCAM) and SOUL-AO as a function of the elevation of the telescope

Prerequisites

  • RR is mounted on the SX side.

Procedure

  • TBD

Templates

Success criteria

  • Estimate the pointing offset and conclude if it is acceptable or not. If not acceptable, take proper actions to overcome this issue.

Notes

LBTO support

  • Authorize SHARK-NIR on the SX side.
  • RR is mounted on the SX side.
  • AO support

Date performed and by whom