wiki:docs/CommissioningPlan/P2.8

Version 20 (modified by kradhakrishnan, 3 years ago) (diff)

--

P2.8 Verification of the mask centering algorithm and final contrast with SOUL-AO and turbulence at ASM

  • Phase : 2
  • Status : Draft
  • Category : Daytime testing (functionality and operability) (C3) + Daytime calibration (C4)
  • Recurrence : once at commissioning
  • Duration : 3 days

Description

  • Verify the efficiency of the mask-centering algorithm and the final contrast with SOUL-AO and artificial turbulence intruded at the ASM.

Prerequisites

  • RR is mounted on the SX side.

Procedure

  • TBW

Templates

Success criteria

  • Final contrast produced for various seeing conditions matches the simulations.

Notes

LBTO support

  • Authorize SHARK-NIR on the SX side.
  • RR is mounted on the SX side.
  • AO support

Date performed and by whom