Changes between Version 13 and Version 14 of docs/CommissioningPlan/P2.8
- Timestamp:
- 02/03/21 19:25:27 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P2.8
v13 v14 11 11 12 12 **Procedure** 13 • Repeat the science calibrations below (some of these are performed when SHARK-NIR was in the LBT cleanroom. Check [wiki:/docs/CommissioningPlan/P1. 9 P1.9]) for details.13 • Repeat the science calibrations below (some of these are performed when SHARK-NIR was in the LBT cleanroom. Check [wiki:/docs/CommissioningPlan/P1.11 P1.11]) for details. 14 14 15 15 ||SDC1||[wiki:/docs/CommissioningPlan/SDC1 Instrumental background for science]||