Changes between Version 13 and Version 14 of docs/CommissioningPlan/P2.8


Ignore:
Timestamp:
02/03/21 19:25:27 (4 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P2.8

    v13 v14  
    1111
    1212**Procedure**
    13 •       Repeat the science calibrations below (some of these are performed when SHARK-NIR was in the LBT cleanroom. Check [wiki:/docs/CommissioningPlan/P1.9 P1.9]) for details.
     13•       Repeat the science calibrations below (some of these are performed when SHARK-NIR was in the LBT cleanroom. Check [wiki:/docs/CommissioningPlan/P1.11 P1.11]) for details.
    1414
    1515||SDC1||[wiki:/docs/CommissioningPlan/SDC1 Instrumental background for science]||