wiki:docs/CommissioningPlan/P2.5

Version 2 (modified by kradhakrishnan, 4 years ago) (diff)

--

P2.5 SOUL AO system tests

  • Phase : 2
  • Status : Draft
  • Category : Daytime testing (functionality and operability) (C2)
  • Recurrence : after instrument installation at telescope platform
  • Duration : 2 hour(s)

Description

  • Proper working of the SOUL AO system is essential for the performance of the SHARK-NIR instrument. We test the working of the SOUL AO system looking at the on-axis PSF (RR) with known disturbances running on the ASM. Also, we test the working of the new features - the waffle mode and inserting a static disturbance to the ASM.

Prerequisites

  • RR mounted and SHARK-NIR aligned to telescope.

Procedure

  • a
  • b

Success criteria

  • SOUL AO system working in tandem with the SAHRK-NIR system.
  • Acceptable improvement of the on-axis PSF (RR) while SOUL AO is closed with known disturbances.
  • Get a new and improved daytime telescope model for SHARK-NIR, if necessary.
  • Successfully running the waffle mode and setting a static shape on the ASM.

Notes LBTO support

  • Mount the RR on SX
  • Support from LBT SW Team, LBTI/Arcetri team.

Associated SHARK-NIR personnel

  • JF, LM, MdP, MM (from AZ)

Date performed and by whom