P2.5 Synergy with LBTI AO system test
- Phase : 2
- Status : Draft
- Category : Daytime testing (functionality and operability) (C2)
- Recurrence : after instrument installation at telescope platform
- Duration : 2 hour(s)
Description
- Test the synergy with the LBTI AO system. If necessary, new interaction matrices are computed with LBTI AO for the telescope SHARK-NIR collimation model.
Prerequisites
- RR mounted and SHARK-NIR aligned to telescope.
Procedure
- a
- b
Success criteria
- LBTI AO system working in tandem with the SAHRK-NIR system.
- New interaction matrices are created and tested?
- Look at the PSF quality with closed-loop and get a new and improved daytime telescope model for SHARK-NIR?
Notes LBTO support
- Mount the RR on SX
- Support from LBTI?
Associated SHARK-NIR personnel
- JF, LM, MdP, MM (from AZ)
Date performed and by whom