wiki:docs/CommissioningPlan/P2.5

Version 1 (modified by kradhakrishnan, 5 years ago) (diff)

--

P2.5 Synergy with LBTI AO system test

  • Phase : 2
  • Status : Draft
  • Category : Daytime testing (functionality and operability) (C2)
  • Recurrence : after instrument installation at telescope platform
  • Duration : 2 hour(s)

Description

  • Test the synergy with the LBTI AO system. If necessary, new interaction matrices are computed with LBTI AO for the telescope SHARK-NIR collimation model.

Prerequisites

  • RR mounted and SHARK-NIR aligned to telescope.

Procedure

  • a
  • b

Success criteria

  • LBTI AO system working in tandem with the SAHRK-NIR system.
  • New interaction matrices are created and tested?
  • Look at the PSF quality with closed-loop and get a new and improved daytime telescope model for SHARK-NIR?

Notes LBTO support

  • Mount the RR on SX
  • Support from LBTI?

Associated SHARK-NIR personnel

  • JF, LM, MdP, MM (from AZ)

Date performed and by whom