Changes between Version 2 and Version 3 of docs/CommissioningPlan/P2.5
- Timestamp:
- 01/18/21 16:51:48 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P2.5
v2 v3 4 4 • **Category** : Daytime testing (functionality and operability) (C2) 5 5 • **Recurrence** : after instrument installation at telescope platform 6 • **Duration** : 2 hour(s)6 • **Duration** : 5 days 7 7 **Description** 8 • Proper working of the SOUL AO system is essential for the performance of the SHARK-NIR instrument. We test the working of the SOUL AO system looking at the on-axis PSF (RR) with known disturbances running on the ASM. Also, we test the working of the new features - the waffle mode and inserting a static disturbance to the ASM. 8 • Proper working of the SOUL AO system is essential for the performance of the SHARK-NIR instrument. Arcetri team optimizes the SOUL AO system grabbing the PSF image from the SHARK-NIR SCICAM. Argos swing arm calibration light source will be used. If this is not available, RR may be used (second choice only). 9 9 10 **Prerequisites** 10 • RR mounted and SHARK-NIR aligned to telescope. 11 * SHARK-NIR active and working normally. 12 * Cryostat cold and SCICAM working properly. 13 * Activity [wiki:/docs/CommissioningPlan/P1.9 P1.9] success criteria met. 14 * Telescope pointed to Zenith and permission to use the Argos swing arm calibration unit. 15 11 16 **Procedure** 12 • a13 • b 17 • AO optimization procedure comes here 18 14 19 **Success criteria** 15 20 • SOUL AO system working in tandem with the SAHRK-NIR system. 16 • Acceptable improvement of the on-axis PSF ( RR) while SOUL AO is closed with known disturbances.21 • Acceptable improvement of the on-axis PSF (Argos Swing arm calibration light source) while SOUL AO is closed with known disturbances. 17 22 • Get a new and improved daytime telescope model for SHARK-NIR, if necessary. 18 • Successfully running the waffle mode and setting a static shape on the ASM. 23 19 24 20 25 21 26 **Notes** 27 22 28 **LBTO support** 23 • Mount the RR on SX29 • Authorize SHARK-NIR on SX side / Authorize mode to use the Argos Swing Arm 24 30 • Support from LBT SW Team, LBTI/Arcetri team. 31 25 32 **Associated SHARK-NIR personnel** 26 • JF, LM, MdP, MM (from AZ) 33 34 27 35 **Date performed and by whom**