Changes between Version 1 and Version 2 of docs/CommissioningPlan/P2.5
- Timestamp:
- 10/06/20 12:16:01 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P2.5
v1 v2 1 == P2.5 S ynergy with LBTI AO system test==1 == P2.5 SOUL AO system tests == 2 2 • **Phase** : 2 3 3 • **Status** : Draft … … 6 6 • **Duration** : 2 hour(s) 7 7 **Description** 8 • Test the synergy with the LBTI AO system. If necessary, new interaction matrices are computed with LBTI AO for the telescope SHARK-NIR collimation model.8 • Proper working of the SOUL AO system is essential for the performance of the SHARK-NIR instrument. We test the working of the SOUL AO system looking at the on-axis PSF (RR) with known disturbances running on the ASM. Also, we test the working of the new features - the waffle mode and inserting a static disturbance to the ASM. 9 9 **Prerequisites** 10 10 • RR mounted and SHARK-NIR aligned to telescope. … … 13 13 • b 14 14 **Success criteria** 15 • LBTI AO system working in tandem with the SAHRK-NIR system. 16 • New interaction matrices are created and tested? 17 • Look at the PSF quality with closed-loop and get a new and improved daytime telescope model for SHARK-NIR? 15 • SOUL AO system working in tandem with the SAHRK-NIR system. 16 • Acceptable improvement of the on-axis PSF (RR) while SOUL AO is closed with known disturbances. 17 • Get a new and improved daytime telescope model for SHARK-NIR, if necessary. 18 • Successfully running the waffle mode and setting a static shape on the ASM. 19 20 18 21 **Notes** 19 22 **LBTO support** 20 23 • Mount the RR on SX 21 • Support from LBT I?24 • Support from LBT SW Team, LBTI/Arcetri team. 22 25 **Associated SHARK-NIR personnel** 23 26 • JF, LM, MdP, MM (from AZ)