Changes between Version 11 and Version 12 of docs/CommissioningPlan/P2.5
- Timestamp:
- 04/22/22 19:21:48 (3 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P2.5
v11 v12 1 == P2.5 SOUL AO system test==1 == P2.5 Cryostat Cooldown and Science detector calibrations == 2 2 3 3 - **Phase** : 2 … … 5 5 - **Category** : Daytime testing (functionality and operability) (C3) + Daytime calibration (C4) 6 6 - **Recurrence** : after instrument installation at telescope platform 7 - **Duration** : 5 days7 - **Duration** : 1 day 8 8 9 9 **Description** 10 - Proper working of the SOUL AO system is essential for the performance of the SHARK-NIR instrument. Arcetri team optimizes the SOUL AO system grabbing the PSF image from the SHARK-NIR SCICAM. The on-axis light source could be the Argos swing arm calibration light source, or one mounted on RR may be used (second choice only).10 - At the beginning of the next run, the cryostat is cooled down and the science detector calibrations are performed (when at the telescope). 11 11 12 12 **Prerequisites** 13 - SHARK-NIR is active and working normally. 14 - Cryostat cold and SCICAM working properly. 15 - Activity [wiki:/docs/CommissioningPlan/P1.12 P1.12] success criteria met. 16 - Telescope pointed to Zenith and permission to use the Argos swing arm calibration unit. 13 17 14 18 15 **Procedure** 19 - AO optimization procedure comes here 16 - For the cryostat cool down, follow P1.4 and P1.5 17 - For science detector calibrations follow P1.7 20 18 21 19 **Templates** 22 20 23 21 **Success criteria** 24 - SOUL AO system is working in tandem with the SHARK-NIR system.25 - Acceptable improvement of the on-axis PSF (Argos Swing arm calibration light source) while SOUL AO is closed with known disturbances.26 - If necessary, get a new and improved daytime telescope model for SHARK-NIR.22 - Cryostat cooled down. 23 - SHARK-NIR working normally. 24 - Science calibrations are performed and new values are saved. 27 25 28 26 **Notes** 27 - Support from the Steward Observatory detector team. 29 28 30 29 **LBTO support** 31 - Authorize SHARK-NIR on the SX side. 32 - Authorize mode to use the Argos Swing Arm. RR will be required on the SX side, if not the Argos swing arm. 33 - AO support. 30 - Follow P1.4 and P1.5 (for the cryostat cool down) 34 31 35 32 **Date performed and by whom**