Changes between Version 3 and Version 4 of docs/CommissioningPlan/P2.3


Ignore:
Timestamp:
01/18/21 16:40:48 (4 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P2.3

    v3 v4  
    44•       **Category**            :       Daytime testing (functionality and operability)  (C2)   
    55•       **Recurrence**  :       after instrument installation at telescope platform
    6 •       **Duration**            :       1 hour(s)
     6•       **Duration**            :       1 day
    77**Description**
    88•       Communication with the LBT TCS is tested, with the aim to verify that the interface with TCS works as expected.
     
    1919**Notes**
    2020**LBTO support**
     21
     22* Authorize SHARK-NIR, connecting to ASM+LBTI AO system
     23* Permission to send preset, receiving LBT telemetry (inc. the derotator trajectory) and details for the fitswriter,
     24* Support from LBT SW team
     25
    2126**Associated SHARK-NIR personnel**
    22 •       JF, LM, MdP, MM (from AZ), Dino?
     27
     28
    2329**Date performed and by whom**