Changes between Version 2 and Version 3 of docs/CommissioningPlan/P2.3
- Timestamp:
- 10/06/20 12:06:57 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P2.3
v2 v3 12 12 • Test all the TCS functionality needed by SHARK-NIR, which are detailed in AD2. 13 13 • Check if the fits-writer is receiving all the right values from the LBT TCS. 14 • Check if the derotator trajectory is received from the LBT TCS. The final testing of the trajectory with optical feedback will be done during the night time commissioning. 15 14 16 **Success criteria** 15 17 • Connection to LBT TCS working well. All the test results are successful.