docs/CommissioningPlan/P2.3
v13 v14 23 23 **Success criteria** 24 24 - Connection to LBT TCS is working well. All the test results are successful. 25 - Fits-writer is receiving all the right values from LBT TCS.25 - The fits-writer is receiving all the right values from LBT TCS. 26 26 - SOUL can retieve the SCICAM image. 27 27 … … 29 29 - Arcetri Team remote support is required. 30 30 - LBTI-AO team support is required. 31 - Note that although the actual work needs roughly about 2 days, a lot of it can go in parallel with other activites. So, for the estimation of the total days, only 1 day from here is considered. 31 32 32 33 **LBTO support** 33 34 34 - Authorize SHARK-NIR 35 35 - Permission to use SX-ASM and LBTI-AO 36 - Permission to send preset, receiving LBT telemetry (inc. the derotator trajectory) and details for the Fitswriter ,36 - Permission to send preset, receiving LBT telemetry (inc. the derotator trajectory) and details for the Fitswriter. 37 37 - Support from the LBT SW team 38 38