    4747**Date performed and by whom**
    4848
     49**Notes**
     50Considering October timelines, as per LBTO information. Platform installation can start at 08:00 and takes about 40 minutes. It can be handled by 2 people. PLatform use stops at 16:00 and dismounting takes about 30 mins.
     51No extra crew is needed on the telescope during weekends for platform, as the operation can be handled by person already available at the telescope.