Changes between Version 21 and Version 22 of docs/CommissioningPlan/P2.2


Ignore:
Timestamp:
09/07/22 12:49:06 (2 years ago)
Author:
mbergomi
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P2.2

    v21 v22  
    1313**Prerequisites**
    1414- SHARK-NIR is aligned and ready for the lift-off.
     15- People required to access the electronics platform have completed the needed training
    1516
    1617**Procedure**
     
    3031- Activities on High-bay and telescope.
    3132- Note that SHARK-NIR is NOT installed as a single piece. The cryostat has to be disassembled from the bearing before the installation can start. Please look into the AD3 document for details.
    32 - Note that one (or two) rack(s) of the SHARK-NIR electronics are installed within the LBTO electronics cabinets (shared with LBTI and iLocater).
     33- Note that one (or two) rack(s) of the SHARK-NIR electronics are installed within the LBTI electronics cabinets (shared with LBTI and iLocater).
    3334- Input from Laura Funk (LBTO): Installation of the LBT work platform takes around 2 hours and of course also its removal. If the telescope installation is performed during the observing semester, carefully plan activities that can be completed so as not to interfere with handover for nighttime observations (~2 hours before sunset).
    3435- check this link (https://docs.google.com/document/d/1r0SDiy9yBEfGQjDI6hCXT9hfRDRJ4dh4nNUZ3JHClJE/edit) for some details on the alignment day to day plan.