  • docs/CommissioningPlan/P2.2

    v17 v18  
    88
    99**Description**
    10 - The functionality and operability of individual components/subsystems are tested. This is followed by the checking of the internal alignment of the instrument using the light source within. The final step is the performance of the system.
     10- The functionality and operability of individual components/sub-systems are tested. Verification of the internal alignment of the instrument is performed using the light source within. The final step is the performance of the system.
    1111
    1212**Prerequisites**
     
    1818- Check the working of all the light sources.
    1919- Using the on-axis diffraction-limited light source, check the internal alignment of the SHARK-NIR.
    20 - Check of on-axis optical quality using phase diversity and of the relative positions of the coronagraphic masks.
     20- Check the relative positions of the coronagraphic masks.
     21- Check of on-axis optical quality.
    2122
    2223**Templates**