Changes between Version 17 and Version 18 of docs/CommissioningPlan/P2.2
- Timestamp:
- 01/14/22 15:01:02 (3 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P2.2
v17 v18 8 8 9 9 **Description** 10 - The functionality and operability of individual components/sub systems are tested. This is followed by the checking of the internal alignment of the instrumentusing the light source within. The final step is the performance of the system.10 - The functionality and operability of individual components/sub-systems are tested. Verification of the internal alignment of the instrument is performed using the light source within. The final step is the performance of the system. 11 11 12 12 **Prerequisites** … … 18 18 - Check the working of all the light sources. 19 19 - Using the on-axis diffraction-limited light source, check the internal alignment of the SHARK-NIR. 20 - Check of on-axis optical quality using phase diversity and of the relative positions of the coronagraphic masks. 20 - Check the relative positions of the coronagraphic masks. 21 - Check of on-axis optical quality. 21 22 22 23 **Templates**