  • docs/CommissioningPlan/P2.0B

    v6 v7  
    2626**Notes**
    2727- Note that one (or two) rack(s) of the SHARK-NIR electronics are installed within the LBTO electronics cabinets (shared with LBTI and iLocater).
    28 - Input from Laura Funk (LBTO): Installation of the LBT platform takes around 4 hours and of course also its removal.
     28- Input from Laura Funk (LBTO): Installation of the LBT work platform takes around 2 hours and of course also its removal. If the telescope installation is performed during the observing semester, carefully plan activities that can be completed so as not to interfere with handover for nighttime observations (~2 hours before sunset).
    2929
    3030**LBTO support**