Changes between Version 4 and Version 5 of docs/CommissioningPlan/P2.0


Ignore:
Timestamp:
01/21/21 10:51:30 (4 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P2.0

    v4 v5  
    88•       Aligned SHARK-NIR is prepared for the Big-Lift and installed on the LBT platform.
    99**Prerequisites**
    10 •       SHARK-NIR aligned and ready for the lift-off.
     10•       SHARK-NIR is aligned and ready for the lift-off.
    1111**Procedure**
    1212•       Look at [https://www.dropbox.com/home/SHARK-NIR/Released%20Docs/After%20FDR_do%20not%20update?preview=SHARK-NIR-INAFP-IP-001_Issue0.2.pdf this] document for the procedure and details.
     
    1515•       Telescope is balanced.
    1616•       Connect all the cables and secure them.
    17 •       Reassure all the connections, nut and bolts etc.
     17•       Reassure all the connections, nuts and bolts, etc.
    1818**Notes**
     19
    1920**LBTO support**
    2021•       Crew members' support for the preparation, lift-off, and installation of SHARK-NIR