Changes between Version 16 and Version 17 of docs/CommissioningPlan/P2.0
- Timestamp:
- 09/07/22 13:01:59 (2 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P2.0
v16 v17 8 8 • All activities to be done on the SHARK-NIR optical bench with the cart open. 9 9 **Prerequisites** 10 • SHARK-NIR personnel present10 • electronics lab cleaned uup by LBTO 11 11 **Procedure** 12 12 - For each rotatory stage, PI116.DGH: 13 - put 2 drops of oil.13 - put 2 drops of Rodorsil 47V500 oil. 14 14 - leave the C-RED2 ND filter wheel as last since it requires dismounting the folding mirror and the lens. 15 15 **Success criteria** … … 23 23 24 24 **Date performed and by whom** 25 25 Minimum number of people available dfrom SN team: 2+1 SW. 26 26 **Comments** 27 MB:in pre-requisites add that electronics lab needs to be cleaned by LBTO first. Luca to provide detail on oil and method to be used, if needed. MInimum number of people available dfrom SN team: 2+1 SW. 27 Luca to provide detail on oil and method to be used, if needed.