Changes between Version 16 and Version 17 of docs/CommissioningPlan/P2.0


Ignore:
Timestamp:
09/07/22 13:01:59 (2 years ago)
Author:
mbergomi
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P2.0

    v16 v17  
    88•       All activities to be done on the SHARK-NIR optical bench with the cart open.
    99**Prerequisites**
    10 •       SHARK-NIR personnel present
     10•       electronics lab cleaned uup by LBTO
    1111**Procedure**
    1212- For each rotatory stage, PI116.DGH:
    13    - put 2 drops of oil.
     13   - put 2 drops of Rodorsil 47V500 oil.
    1414   - leave the C-RED2 ND filter wheel as last since it requires dismounting the folding mirror and the lens.
    1515**Success criteria**
     
    2323
    2424**Date performed and by whom**
    25 
     25Minimum number of people available dfrom SN team: 2+1 SW.
    2626**Comments**
    27 MB:in pre-requisites add that electronics lab needs to be cleaned by LBTO first. Luca to provide detail on oil and method to be used, if needed. MInimum number of people available dfrom SN team: 2+1 SW.
     27Luca to provide detail on oil and method to be used, if needed.