Changes between Version 11 and Version 12 of docs/CommissioningPlan/P2.0


Ignore:
Timestamp:
02/02/21 12:13:10 (4 years ago)
Author:
kradhakrishnan
Comment:

Reverted to version 10.

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P2.0

    v11 v12  
    1 == P2.0 Installation of SHARK-NIR at the LBT platform - 2==
     1== P2.0 Installation of SHARK-NIR at the LBT platform (will modify for cabling and check )==
    22•       **Phase**               :       2 
    33•       **Status**              :       Draft   
    4 •       **Category**            :       Installation of SHARK-NIR at LBT platform (C2
     4•       **Category**            :       Unpack, Assemble, Verification, and Installation (C1)   
    55•       **Recurrence**  :       once (unless deemed necessary to remove SHARK-NIR from the telescope platform)
    6 •       **Duration**            :       2 days.
     6•       **Duration**            :       2 days for preparation, 1 day for installation , and 1 day contingency.
    77**Description**
    8 •       Installation of the electronics cabinets, cabling, and confirming the safety & security of the instrument and area.
     8•       Aligned SHARK-NIR is prepared for the Big-Lift and installed on the LBT platform.
    99**Prerequisites**
    10 •       SHARK-NIR (main parts) are installed on the LBTO platform (P2.0A).
     10•       SHARK-NIR is aligned and ready for the lift-off.
    1111**Procedure**
    1212•       Look at AD4 document for the procedure and details.
     
    1616•       Connect all the cables and secure them.
    1717•       Reassure all the connections, nuts and bolts, etc.
    18 * Confirm the safety and scuory of the instrument and the area.
    1918**Notes**
    20 Note that one (or two) rack(s) of the SHARK-NIR electronics are installed within the LBTO electronics cabinets (shared with LBTI and iLocater).
     19Note that SHARK-NIR is NOT installed as a single piece. The cryostat has to be disassembled from bearing before the installation can start. Please look into the AD4 document for details.
    2120
    2221**LBTO support**
    23 •       Crew members' support for the preparation, lift-off, and installation of SHARK-NIR electronics cabinet
     22•       Crew members' support for the preparation, lift-off, and installation of SHARK-NIR
    2423* Crane operator (mountain bay, LBT platform)
    2524* Safety officer
    2625* Working platform installed in front of the Gregorian focal-station SX,
    27 * Hatch door SX on the UIAP platform removed ???
     26* Hatch door SX on the UIAP platform removed
     27* Support for the installation of electronics in LBTI/SHARK cabinet
    2828* kindly check the installation document for more details
    2929
     
    3434**Comments**
    3535
     36MB: Please specify that Cryostat has to be disassembled from bearing before the installation can start. Put AD number instead of link.
     37Concerning recurrence, in principle is only one, however optical bench only might have very low chances of being dismounted at some point for refurbishment of components which might be hard to happen in place
     38
    3639LM: this seems to be a duplicate of 2.0A. Please check.