Changes between Version 6 and Version 7 of docs/CommissioningPlan/P1.9
- Timestamp:
- 01/26/21 11:45:19 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P1.9
v6 v7 13 13 • Internal alignment of the SHARK-NIR is verified. 14 14 **Procedure** 15 • check linearity, create bad pixel mask, bias calibration, master dark,and then perform the following daytime calibration procedures below.15 • check bias calibration & master dark scripts and then perform the following daytime calibration procedures below. 16 16 17 17 ||SDC1||[wiki:/docs/CommissioningPlan/SDC1 Instrumental background for science]||