Changes between Version 3 and Version 4 of docs/CommissioningPlan/P1.9


Ignore:
Timestamp:
01/15/21 18:59:16 (4 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P1.9

    v3 v4  
    22•       **Phase**               :       1 
    33•       **Status**              :       Draft   
    4 •       **Category**            :       Installation, integration, verification (C1)                           
     4•       **Category**            :       Unpack, Assemble, Verification, and Installation (C1)
    55•       **Recurrence**  :       once
    6 •       **Duration**            :       6 hour(s)
     6•       **Duration**            :       1 day
    77**Description**
    8 •       Calibration of the SHARK-NIR science detector: Gain, bad pixels, read noise, linearity, dark current, flat field, cross-talk, persistence, pattern noise.
     8•       Calibration and testing of the SHARK-NIR science detector
    99**Prerequisites**
    1010•       SHARK-NIR connected to LBT network.
     
    1515•       check linearity, create bad pixel mask, bias calibration, master dark, and then perform the following daytime calibration procedures below.
    1616
    17 ||P3.20||[wiki:/docs/CommissioningPlan/P3.20 Instrumental background for science]||Day||(TBD)||C3||-||
    18 ||P3.22||[wiki:/docs/CommissioningPlan/P3.22 Instrument flat field, detector linearity and bad pixels]||Day||2 hours||C3||-||
    19 ||P3.23||[wiki:/docs/CommissioningPlan/P3.23 Wavelength calibration]||Day||2 hours||C3||-||
    20 ||P3.24||[wiki:/docs/CommissioningPlan/P3.24 Thermal background]||Day||2 hours||C3||-||
    21 ||P3.25||[wiki:/docs/CommissioningPlan/P3.25 Detector gain]||Day||2 hours||C3||-||
    22 ||P3.26||[wiki:/docs/CommissioningPlan/P3.26 Detector persistence]||Day||2 hours||C3||-||
    23 ||P3.27||[wiki:/docs/CommissioningPlan/P3.27 Spectral resolution]||Day||2 hours||C3||-||
    24 ||P3.28||[wiki:/docs/CommissioningPlan/P3.28 Ghost calibration]||Day||2 hours||C3||-||
    25 ||P3.30||[wiki:/docs/CommissioningPlan/P3.30 Filter wheels reproducibility monitoring]||Day||2 hours||C3||-||
     17||SDC1||[wiki:/docs/CommissioningPlan/SDC1 Instrumental background for science]||
     18||SDC2||[wiki:/docs/CommissioningPlan/SDC2 Instrument flat field, detector linearity and bad pixels]||
     19||SDC3||[wiki:/docs/CommissioningPlan/SDC3 Wavelength calibration]||
     20||SDC4||[wiki:/docs/CommissioningPlan/SDC4 Thermal background]||
     21||SDC5||[wiki:/docs/CommissioningPlan/SDC5 Detector gain]||
     22||SDC6||[wiki:/docs/CommissioningPlan/SDC6 Detector persistence]||
     23||SDC7||[wiki:/docs/CommissioningPlan/SDC7 Spectral resolution]||
     24||SDC8||[wiki:/docs/CommissioningPlan/SDC8 Ghost calibration]||
     25||SDC9||[wiki:/docs/CommissioningPlan/SDC9 Filter wheels reproducibility monitoring]||
    2626**Success criteria**
    2727•       linearity as expected
    2828•       bad pixels mask created
    2929•       bias and flat took
     30* All individual activity (in the table) success criteria is met
    3031**Notes**
    31 •       Save all the intermediate images for Dino to check the SHARK-NIR Data Reduction pipeline.
     32•       Save all the intermediate images to check the SHARK-NIR Data Reduction pipeline.
    3233**LBTO support**
     34
    3335**Associated SHARK-NIR personnel**
    34 •       JF, LM, MdP, MM (from AZ), Dino?
     36
    3537**Date performed and by whom**