Changes between Version 1 and Version 2 of docs/CommissioningPlan/P1.9
- Timestamp:
- 01/11/21 11:57:19 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P1.9
v1 v2 4 4 • **Category** : Installation, integration, verification (C1) 5 5 • **Recurrence** : once 6 • **Duration** : 1hour(s)6 • **Duration** : 6 hour(s) 7 7 **Description** 8 8 • Calibration of the SHARK-NIR science detector: Gain, bad pixels, read noise, linearity, dark current, flat field, cross-talk, persistence, pattern noise. … … 13 13 • Internal alignment of the SHARK-NIR is verified. 14 14 **Procedure** 15 • A 16 • B 17 • c 15 • check linearity, create bad pixel mask, bias calibration, master dark, and then perform the following daytime calibration procedures below. 16 • Instrumental background for science 17 • Instrument flat field, detector linearity and bad pixels 18 • Wavelength calibration 19 • Thermal background 20 • Detector gain 21 • Detector persistence 22 • Spectral resolution 23 • Ghost calibration 18 24 **Success criteria** 19 25 • linearity as expected