wiki:docs/CommissioningPlan/P1.9

Version 1 (modified by kradhakrishnan, 5 years ago) (diff)

--

P1.9 Science detector calibrations

  • Phase : 1
  • Status : Draft
  • Category : Installation, integration, verification (C1)
  • Recurrence : once
  • Duration : 1 hour(s)

Description

  • Calibration of the SHARK-NIR science detector: Gain, bad pixels, read noise, linearity, dark current, flat field, cross-talk, persistence, pattern noise.

Prerequisites

  • SHARK-NIR connected to LBT network.
  • Electronics cabinets on.
  • The cryostat should be running and cooled down.
  • Internal alignment of the SHARK-NIR is verified.

Procedure

  • A
  • B
  • c

Success criteria

  • linearity as expected
  • bad pixels mask created
  • bias and flat took

Notes

  • Save all the intermediate images for Dino to check the SHARK-NIR Data Reduction pipeline.

LBTO support Associated SHARK-NIR personnel

  • JF, LM, MdP, MM (from AZ), Dino?

Date performed and by whom