Changes between Version 16 and Version 17 of docs/CommissioningPlan/P1.9
- Timestamp:
- 04/22/22 18:24:41 (3 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P1.9
v16 v17 1 == P1.9 Internal tip-tilt loop verification == 1 == P1.9 Testing of SCICAM image grabbing by SOUL-AO == 2 2 3 - **Phase** : 1 4 - **Status** : Draft 5 - **Category** : Unpack, Assemble, and Verification (C1)6 - **Recurrence** : once at commissioning7 - **Duration** : 1 day3 - **Phase** : 1 4 - **Status** : Draft 5 - **Category** : Daytime testing (functionality and operability) (C3) 6 - **Recurrence** : once 7 - **Duration** : 0.5 days 8 8 9 9 **Description** 10 - Check the working of the internal tip-tilt loop using calibration unit light sources, C-RED2, and ALPAO-DM.10 - Testing the SCICAM imaging grabbing (from a repository/folder) by SOUL-AO which is a pre-requisite for the SOUL-AO optimization for SHARK-NIR. 11 11 12 12 **Prerequisites** 13 - SCICAM cooled down. 13 - ICE compatibility between SHARK-NIR and SOUL-AO system. 14 - SCICAM image should have a header following FITS standard. 14 15 15 16 **Procedure** 16 - Run the internal tip-tilt loop routine for different brightness of the source (star). 17 - Check its efficiency in keeping the PSF at the C-RED2 hot-pixel. 18 - Save data to the repository and analyze them. 17 - Save a SCICAM image (with a PSF image) on the agreed folder or repository. 18 - Check if SOUL-AO can grab the image and analyze the PSF. 19 19 20 20 **Templates** 21 - SHARKNIR_gen_tiptilt_loop (not released)22 21 23 22 **Success criteria** 24 - Internal tip-tilt routine works fine and the PSF at the C-RED2 is stable within the required precision. 25 - All the data and analysis are saved in the repository. 23 - SOUL-AO SW can grab the SCICAM image. 26 24 27 25 **Notes** 26 - The time dedicated to this activity has to be considered in combination with the other activities if needed. Parallelism is possible. 27 - Points of contact: Alfio and Fabio from Arcetri. 28 28 29 29 **LBTO support** 30 30 - Liquid Nitrogen refill is required in the cleanroom. 31 - Support of an IT personnel (for help related to network configuration) and an SW personnel (for help related to the TCS interface). 31 32 32 33 **Date performed and by whom** 34