     1== P1.9 Science detector calibrations ==
     2•       **Phase**               :       1 
     3•       **Status**              :       Draft   
     4•       **Category**            :       Installation, integration, verification (C1)                           
     5•       **Recurrence**  :       once
     6•       **Duration**            :       1 hour(s)
     7**Description**
     8•       Calibration of the SHARK-NIR science detector: Gain, bad pixels, read noise, linearity, dark current, flat field, cross-talk, persistence, pattern noise.
     9**Prerequisites**
     10•       SHARK-NIR connected to LBT network.
     11•       Electronics cabinets on.
     12•       The cryostat should be running and cooled down.
     13•       Internal alignment of the SHARK-NIR is verified.
     14**Procedure**
     15•       A
     16•       B
     17•       c
     18**Success criteria**
     19•       linearity as expected
     20•       bad pixels mask created
     21•       bias and flat took
     22**Notes**
     23•       Save all the intermediate images for Dino to check the SHARK-NIR Data Reduction pipeline.
     24**LBTO support**
     25**Associated SHARK-NIR personnel**
     26•       JF, LM, MdP, MM (from AZ), Dino?
     27**Date performed and by whom**