Changes between Version 1 and Version 2 of docs/CommissioningPlan/P1.8
- Timestamp:
- 01/15/21 18:13:59 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P1.8
v1 v2 2 2 • **Phase** : 1 3 3 • **Status** : Draft 4 • **Category** : Installation, integration, verification (C1)4 • **Category** : Unpack, Assemble, Verification, and Installation (C1) 5 5 • **Recurrence** : once 6 • **Duration** : 2 hour(s)6 • **Duration** : 4 days 7 7 **Description** 8 8 • Check the internal alignment of the SHARK-NIR using the light sources within. … … 14 14 • Use the on-axis calibration fiber and checking if the spot position on the scientific detector is consistent with the one recorded before shipping for multiple bearing angles. 15 15 • Check the pupil position at the detector and verify the consistency with the one before shipping. 16 • Check the relative alignment of the coronographic masks 16 • Check the relative alignment of the coronographic masks. 17 17 • Verify the contrast obtained for different sets of masks on the scientific camera and compare it with the values before shipping. 18 • If necessary, re-align the optical bench internally .18 • If necessary, re-align the optical bench internally (this is not anticipated, and the time above do not consider this). 19 19 **Success criteria** 20 20 • The on-axis spot at the SCICAM is where it should be across the bearing rotation? … … 24 24 **LBTO support** 25 25 **Associated SHARK-NIR personnel** 26 • JF, LM, MdP, 26 27 27 **Date performed and by whom**