Changes between Version 1 and Version 2 of docs/CommissioningPlan/P1.8


Ignore:
Timestamp:
01/15/21 18:13:59 (4 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P1.8

    v1 v2  
    22•       **Phase**               :       1 
    33•       **Status**              :       Draft   
    4 •       **Category**            :       Installation, integration, verification (C1)
     4•       **Category**            :       Unpack, Assemble, Verification, and Installation (C1)
    55•       **Recurrence**  :       once
    6 •       **Duration**            :       2 hour(s)
     6•       **Duration**            :       4 days
    77**Description**
    88•       Check the internal alignment of the SHARK-NIR using the light sources within.
     
    1414•       Use the on-axis calibration fiber and checking if the spot position on the scientific detector is consistent with the one recorded before shipping for multiple bearing angles.
    1515•       Check the pupil position at the detector and verify the consistency with the one before shipping.
    16 •       Check the relative alignment of the coronographic masks
     16•       Check the relative alignment of the coronographic masks.
    1717•       Verify the contrast obtained for different sets of masks on the scientific camera and compare it with the values before shipping.
    18 •       If necessary, re-align the optical bench internally.
     18•       If necessary, re-align the optical bench internally (this is not anticipated, and the time above do not consider this).
    1919**Success criteria**
    2020•       The on-axis spot at the SCICAM is where it should be across the bearing rotation?
     
    2424**LBTO support**
    2525**Associated SHARK-NIR personnel**
    26 •       JF, LM, MdP,
     26
    2727**Date performed and by whom**