Version 2 (modified by kradhakrishnan, 4 years ago) (diff) |
---|
P1.8 Verification of the internal alignment of the instrument
- Phase : 1
- Status : Draft
- Category : Unpack, Assemble, Verification, and Installation (C1)
- Recurrence : once
- Duration : 4 days
Description
- Check the internal alignment of the SHARK-NIR using the light sources within.
Prerequisites
- SHARK-NIR connected to LBT network.
- Electronics cabinets on.
- The cryostat should be running and cooled down.
Procedure
- Use the on-axis calibration fiber and checking if the spot position on the scientific detector is consistent with the one recorded before shipping for multiple bearing angles.
- Check the pupil position at the detector and verify the consistency with the one before shipping.
- Check the relative alignment of the coronographic masks.
- Verify the contrast obtained for different sets of masks on the scientific camera and compare it with the values before shipping.
- If necessary, re-align the optical bench internally (this is not anticipated, and the time above do not consider this).
Success criteria
- The on-axis spot at the SCICAM is where it should be across the bearing rotation?
- Use pupil images and compare?
- PSF quality across?
Notes LBTO support Associated SHARK-NIR personnel
Date performed and by whom