Changes between Version 10 and Version 11 of docs/CommissioningPlan/P1.6
- Timestamp:
- 01/28/21 15:46:35 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P1.6
v10 v11 10 10 • SHARK-NIR connected to LBT network. 11 11 • Electronics cabinets on. 12 • Needs vacuum pumping at the beginning (vacuum pressure of 10e-5 Torr is good (see the cryostat manual SHARK-NIR_SO-MAN-001). 13 • Liquid nitrogen pumped? 12 • Needs vacuum pumping at the beginning (vacuum pressure of 10e-5 Torr is good (see the cryostat manual SHARK-NIR_SO-MAN-001)). 14 13 **Procedure** 15 14 • Start the cryostat cooling down sequence (see the cryostat manual SHARK-NIR_SO-MAN-001). … … 28 27 29 28 **Comments** 30 LM: I do not see liquid nitrogen pumped as a prerequisite, but rather part of the procedure 29 LM: I do not see liquid nitrogen pumped as a prerequisite, but rather part of the procedure [DONE]