  • docs/CommissioningPlan/P1.6

    v10 v11  
    1010•       SHARK-NIR connected to LBT network.
    1111•       Electronics cabinets on.
    12 •       Needs vacuum pumping at the beginning (vacuum pressure of 10e-5 Torr is good (see the cryostat manual SHARK-NIR_SO-MAN-001).
    13 •       Liquid nitrogen pumped?
     12•       Needs vacuum pumping at the beginning (vacuum pressure of 10e-5 Torr is good (see the cryostat manual SHARK-NIR_SO-MAN-001)).
    1413**Procedure**
    1514•       Start the cryostat cooling down sequence (see the cryostat manual SHARK-NIR_SO-MAN-001).
     
    2827
    2928**Comments**
    30 LM: I do not see liquid nitrogen pumped as a prerequisite, but rather part of the procedure
     29LM: I do not see liquid nitrogen pumped as a prerequisite, but rather part of the procedure [DONE]