  • docs/CommissioningPlan/P1.4

    v2 v3  
    22•       **Phase**               :       1 
    33•       **Status**              :       Draft   
    4 •       **Category**            :       Installation, integration, verification (C1)                           
     4•       **Category**            :       Unpack, Assemble, Verification, and Installation (C1)
    55•       **Recurrence**  :       once
    6 •       **Duration**            :       2 hour(s)
     6•       **Duration**            :       half a day
    77**Description**
    8 •       At the LBT clean room, cable in the instrument. Power on the cabinets,install workstations, and connect SHARK-NIR to LBT network.
     8•       At the LBT clean room, cable in the instrument. Power on the cabinets, install workstations, and connect SHARK-NIR to LBT network.
    99**Prerequisites**
    1010•       All the necessary tools and safety features to do the cabling. A free and accessible network port to connect SHARK-NIR to LBT network.
     
    1212•       Carefully cable in SHARK-NIR.
    1313•       Switch on the electronics cabinets.
    14 •       Install the instrument workstation in the server room and scientific camera workstation in control room level 2
    15 •       Install the scientific camera workstation in control room level 2
     14•       Install the instrument workstation in the server room and scientific camera workstation in control room level 2.
     15•       Install the scientific camera workstation in control room level 2.
    1616•       Connect SHARK-NIR to the LBT network.
    1717**Success criteria**
     
    2323•       Any electronics support needed?
    2424**Associated SHARK-NIR personnel**
    25 •       JF, LM, MdP,
     25
    2626**Date performed and by whom**