Changes between Version 2 and Version 3 of docs/CommissioningPlan/P1.4
- Timestamp:
- 01/15/21 15:02:52 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P1.4
v2 v3 2 2 • **Phase** : 1 3 3 • **Status** : Draft 4 • **Category** : Installation, integration, verification (C1)4 • **Category** : Unpack, Assemble, Verification, and Installation (C1) 5 5 • **Recurrence** : once 6 • **Duration** : 2 hour(s)6 • **Duration** : half a day 7 7 **Description** 8 • At the LBT clean room, cable in the instrument. Power on the cabinets, install workstations, and connect SHARK-NIR to LBT network.8 • At the LBT clean room, cable in the instrument. Power on the cabinets, install workstations, and connect SHARK-NIR to LBT network. 9 9 **Prerequisites** 10 10 • All the necessary tools and safety features to do the cabling. A free and accessible network port to connect SHARK-NIR to LBT network. … … 12 12 • Carefully cable in SHARK-NIR. 13 13 • Switch on the electronics cabinets. 14 • Install the instrument workstation in the server room and scientific camera workstation in control room level 2 15 • Install the scientific camera workstation in control room level 2 14 • Install the instrument workstation in the server room and scientific camera workstation in control room level 2. 15 • Install the scientific camera workstation in control room level 2. 16 16 • Connect SHARK-NIR to the LBT network. 17 17 **Success criteria** … … 23 23 • Any electronics support needed? 24 24 **Associated SHARK-NIR personnel** 25 • JF, LM, MdP, 25 26 26 **Date performed and by whom**