  • docs/CommissioningPlan/P1.3

    v1 v2  
    22•       **Phase**               :       1 
    33•       **Status**              :       Draft   
    4 •       **Category**            :       Installation, integration, verification (C1)                           
     4•       **Category**            :       Unpack, Assemble, Verification, and Installation (C1)                           
    55•       **Recurrence**  :       once
    6 •       **Duration**            :       4 hour(s)
     6•       **Duration**            :       half a day
    77**Description**
    88•       Install and integrate the different SHARK-NIR opto-mechanical components onto the mechanical structure. Install the electronics cabinets. Move the unit to the cleanroom.
     
    2121•       1-2 crew to support installation on the mechanical structure.
    2222**Associated SHARK-NIR personnel**
    23 •       JF, LM, MdP,
     23
    2424**Date performed and by whom**