Changes between Version 3 and Version 4 of docs/CommissioningPlan/P1.12
- Timestamp:
- 01/18/22 15:09:49 (3 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P1.12
v3 v4 11 11 12 12 **Prerequisites** 13 - ICE compatibility between SHARK-NIR and SOUL-AO system 14 - SCICAM image should have a header following FITS standard 13 - ICE compatibility between SHARK-NIR and SOUL-AO system. 14 - SCICAM image should have a header following FITS standard. 15 15 16 16 **Procedure** 17 - Save a SCICAM image (with a PSF image) on the agreed folder or repository 18 - Check if SOUL-AO can grab the image and analyze the PSF 17 - Save a SCICAM image (with a PSF image) on the agreed folder or repository. 18 - Check if SOUL-AO can grab the image and analyze the PSF. 19 19 20 20 **Templates** 21 21 22 22 **Success criteria** 23 - SOUL-AO SW can grab the SCICAM image 23 - SOUL-AO SW can grab the SCICAM image. 24 24 25 25 **Notes** 26 26 - The time dedicated to this activity has to be considered in combination with the other activities if needed. Parallelism is possible. 27 - Points of contact: Alfio and Fabio from Arcetri 27 - Points of contact: Alfio and Fabio from Arcetri. 28 28 29 29 **LBTO support**