wiki:docs/CommissioningPlan/P1.12

Version 3 (modified by kradhakrishnan, 3 years ago) (diff)

--

P1.12 Testing of SCICAM image grabbing by SOUL-AO

  • Phase : 1
  • Status : Draft
  • Category : Daytime testing (functionality and operability) (C3)
  • Recurrence : once
  • Duration : 2 days

Description

  • Testing the SCICAM imaging grabbing (from a repository/folder) by SOUL-AO which is a pre-requisite for the SOUL-AO optimization for SHARK-NIR.

Prerequisites

  • ICE compatibility between SHARK-NIR and SOUL-AO system
  • SCICAM image should have a header following FITS standard

Procedure

  • Save a SCICAM image (with a PSF image) on the agreed folder or repository
  • Check if SOUL-AO can grab the image and analyze the PSF

Templates

Success criteria

  • SOUL-AO SW can grab the SCICAM image

Notes

  • The time dedicated to this activity has to be considered in combination with the other activities if needed. Parallelism is possible.
  • Points of contact: Alfio and Fabio from Arcetri

LBTO support

  • Liquid Nitrogen refill is required in the cleanroom.
  • LBTO SW support may be required

Date performed and by whom