Changes between Version 2 and Version 3 of docs/CommissioningPlan/P1.12
- Timestamp:
- 01/14/22 13:31:24 (3 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P1.12
v2 v3 1 1 == P1.12 Testing of SCICAM image grabbing by SOUL-AO == 2 • **Phase** : 1 3 • **Status** : Draft 4 • **Category** : Unpack, Assemble, and Verification (C1) 5 • **Recurrence** : once 6 • **Duration** : 2 days 2 3 - **Phase** : 1 4 - **Status** : Draft 5 - **Category** : Daytime testing (functionality and operability) (C3) 6 - **Recurrence** : once 7 - **Duration** : 2 days 8 7 9 **Description** 8 • Testing the SCICAM imaging grabbing (from a repository/folder) by SOUL-AO which is a pre-requisite for the SOUL-AO optimization for SHARK-NIR 10 - Testing the SCICAM imaging grabbing (from a repository/folder) by SOUL-AO which is a pre-requisite for the SOUL-AO optimization for SHARK-NIR. 11 9 12 **Prerequisites** 10 • ICE compatibility between SHARK-NIR and SOUL-AO system 11 * SCICAM image should have a header following FITS standard 13 - ICE compatibility between SHARK-NIR and SOUL-AO system 14 - SCICAM image should have a header following FITS standard 15 12 16 **Procedure** 13 • Save a SCICAM image (with a PSF image) on the agreed folder or repository 14 • Check if SOUL-AO can grab the image and analyze the PSF 17 - Save a SCICAM image (with a PSF image) on the agreed folder or repository 18 - Check if SOUL-AO can grab the image and analyze the PSF 19 20 **Templates** 21 15 22 **Success criteria** 16 • SOUL-AO SW can grab the SCICAM image 23 - SOUL-AO SW can grab the SCICAM image 24 17 25 **Notes** 18 The time dedicated to this activity has to be considered in combination with the other activities if needed. Parallelism is possible.19 *Points of contact: Alfio and Fabio from Arcetri26 - The time dedicated to this activity has to be considered in combination with the other activities if needed. Parallelism is possible. 27 - Points of contact: Alfio and Fabio from Arcetri 20 28 21 29 **LBTO support** 22 * Liquid Nitrogen refill is required in the cleanroom. 23 * LBTO SW support may be required 24 25 **Associated SHARK-NIR personnel** 30 - Liquid Nitrogen refill is required in the cleanroom. 31 - LBTO SW support may be required 26 32 27 33 **Date performed and by whom**